The Independent Planning Commission approved the development on 17 July 2025. A modification approved in March 2026 increased the apartment count from 198 to 199 and reduced the ground-floor retail area.
Novus on Albert: build-to-rent apartments in Chatswood
Novus on Albert will bring 199 rental apartments and ground-floor retail to the corner of Pacific Highway and Albert Avenue. The 27-storey development is under construction.
Published on Last updated:

Photo 1 of 3
What’s planned
199 residences
Build-to-rent housing with ground-floor retail
- Parking
- 3 basement levels
- Building height
- 27 storeys
Novus will operate the rental apartments. Planned resident facilities include a swimming pool, gym, wellness areas, co-working spaces, a rooftop lounge and an outdoor terrace. These are residential amenities; the ground-floor retail provides the development’s separate commercial space.
The development consent does not approve the detailed fit-out or operation of the retail premises. Those uses will need separate approvals where required.
Binah lists expected completion as Q2 2029, consistent with Novus’s mid-2029 forecast. This remains a delivery target rather than a confirmed opening date.
Existing site

The redevelopment includes the former Chatswood Fire Station at 767 Pacific Highway. Completed in 1899 and opened on 14 February 1900, the locally heritage-listed building was later converted to retail use. Its original lookout tower had already been removed before the redevelopment was proposed.

Novus reported that early site works and demolition were underway in March 2026. The approved scheme allows the existing buildings, including the former fire station, to be demolished.
How the fire station will be remembered
The approved heritage approach uses a mesh structure to represent the former fire station’s façade, with salvaged materials where possible and information explaining its history. It does not preserve the original building.
Consent conditions require photographic recording before demolition, measures to protect materials intended for reuse, and a detailed heritage interpretation strategy developed in consultation with council.
Project timeline
Dates identify reported events within each phase and may differ from its start date.
Under Construction
Construction · Works in ProgressThe construction phase begins when building works actually start, following the required approvals and consent conditions.
Determination
A verified planning decision, including approval, refusal or deferral. An unconfirmed outcome is not treated as approval.
Under Assessment
Assessment following formal lodgement of the development application, including exhibition, responses to submissions and revisions.
Planning Underway
Early planning, including SEARs requests, assessment requirements issued and preparation of the development application.
Planning record: NSW Planning Portal (SSD-59805958)
Project Details
- Architect
- Rothelowman
- Developer and operator
- Novus
- Builder
- Binah
- Applicant
- The Trustee for Albert Avenue Sub Trust